Are you looking for good job? Are you strong enough to handle the team with your management and planning? Are you interested to work as Test manager? Then move on to wisdom jobs online portal. Test manager’s role is to lead the testing team. Test manager plays a central role in the team. The test manager takes full responsibility for the project success. The role involves quality and test advocacy resource planning and management and resolution of issues that impede the testing efforts. Roles organize the responsibility for performing tasks and developing work products into logical groups. So, grab the opportunity by looking into the Test manager job interview questions and answers given below and get appointed in the final interview.
Question 1. Mention The Responsibilities Of The Test Manager?
Answer :
Role of QA Manager includes
Answer :
As a QA Lead your approach should be
Question 3. Mention What Is Requirement Traceability Matrix?
Answer :
Requirement Traceability Matrix is a tool that ensures that through-out the whole development process.
It is used for the following reason:
Question 4. Mention What Is The Difference Between Beta And Pilot Testing?
Answer :
A Beta Testing is referred when the product is going to release to the end users whereas pilot testing is referred for the product when it is in the earlier phase of the development cycle.
In beta testing application is given to a few users to ensure that application meet the user requirement and does not consist any showstopper whereas in case of pilot testing team member gives their feedback to improve the quality of the application.
Question 5. Mention What Is A Test Plan?
Answer :
Test plan is a document describing the activities and the testing scope. It is the basic requirement before testing any software product.
Question 6. Mention What Types Of Test Plan And What Does The Testing Level Test Plan Include?
Answer :
There are three main plan Master Test Plan, Testing level specific Test Plan and Testing type specific test plans.
Testing level test plan includes
Question 7. Explain How Testing Is Affected By Object-oriented Designs?
Answer :
Well-designed object-oriented can make it easier to trace from code to internal design to functional design to requirements.
Question 8. Mention What Is ‘configuration Management’?
Answer :
‘Configuration Management’ covers the processes used to co-ordinate, control and track: code, requirements, documentation, problems, designs, change requests, designs etc.
Question 9. Explain How Do Distribute Multi-tier Environment Affect Testing?
Answer :
Most current software being tested includes distributed and multi-tier applications which can be highly complex due to the multiple dependencies among systems, hardware and servers, data communications. Therefore, testing requirements can be extensive. When time is, less a focus on integration and system can be considered.
Question 10. Mention What Is Informal Reviews?
Answer :
Informal reviews are implemented many times during the early stages of the life cycle of the document. These reviews often include more people and a meeting. The purpose of the informal review is to keep the author and enhance the quality of the document. Informal reviews are not documented.
Question 11. Mention What Are The Risk To Be Avoided While Testing?
Answer :
The risk that has to be avoided while testing includes
Question 12. Mention What Are The Counter Measures That Test Manager Should Take Against Risks?
Answer :
Test manager must take following steps to mitigate the risk while developing product
Avoidance: Eliminate the risk factor that is involved
Reduction: Mitigate plan to decrease the impact of risks and to take correct measures
Sharing: Transfer the risk to other resource such as insource or insure
Accept: Accept the risk and prepare a plan budget for this risks
Question 13. Explain How Test Manager Can Estimate The Project And What To Estimate?
Answer :
While carrying out the project, mainly test manager has to estimate four things Cost, Resources, Human Skills and Time.
They can estimate the project in following ways
Work breakdown structure (WBS): Breaking down project into smaller segments
Three-point estimation: Three-point estimation is based on statistical data
Functional point method: Give weightage to each function and measure the size
Question 14. Mention What Is Three-point Estimation?
Answer :
In the three-point estimation, three values are initially produced for every task based on previous experience.
For example: to complete a specific what are the different possibilities
Best case estimate: 120 man hours or 15 days with experienced team members
The most likely estimate: 170 hours or 21 days with enough resources and team members experience
The worst-case estimate: 200 man hours or 25 days and with a lesser work experience
Question 15. Mention Some Of The Best Practices For Test Estimation?
Answer :
Some of the best practices for Test Estimation is
Add some buffer time: Having a buffer time is always an advantage, it may help to deal with a delay caused due to unexpected reason like talented member quits the job suddenly,
Account resource planning in estimation: Make sure that your estimation is realistic, and considered important factors like availability of human resource, resource planning,
Use the past experience reference: Through your past experience try to avoid all the obstacles or possible hindrance that are most likely to happen
Stick to your estimation: Estimation is not full proof, it may go wrong also. In the early phase of the project, you should re-check the test estimation and if required make modification as well.
Question 16. Explain What Does A Good Test Report Should Include In It?
Answer :
A good test report should include
Question 17. List Out Some Of The Software Quality Assurance Best Practice?
Answer :
Some of the best practices for software Quality Assurance includes
Question 18. By What Factors You Can Determine The Quality Of The Test Execution?
Answer :
Two ways can determine the quality of test execution
Defect rejection ratio: (No. of defects rejected/ total no. of defects raised) X 100
Defect leakage ratio: (No. of defect missed/total defects of software) X 100
Question 19. Explain What Is Manual Support Testing And Manual Scripted Testing?
Answer :
Manual support testing: It is conducted by test team. It is a testing that includes testing of all the functions performed by the people while preparing the data and using these data from an automated
Manual scripted testing: Manual testing team does it. It is a method in which the test cases are reviewed and designed by the team before executing it.
Question 20. Mention What Are Some Key Challenges Of Software Testing?
Answer :
Key challenges of software testing include:
Test Manager Related Tutorials |
|
---|---|
LoadRunner Tutorial | WinRunner Tutorial |
QTP Tutorial | Quality Management Tutorial |
Quality Center (QC) Tutorial | Software testing Tutorial |
All rights reserved © 2020 Wisdom IT Services India Pvt. Ltd
Wisdomjobs.com is one of the best job search sites in India.