Are you familiar with the Control M concepts? Are you in search of Control M jobs then you don’t need to go anywhere we Wisdomjobs.com in our site we provided a detail on Control M Interview Question and Answers along with the job positions. To be precise about Control M Workload Automation solution: Control-M automates and simplifies batch job creation, scheduling, and management across IT environments. It makes it easy to build and monitor workflows through a graphical interface that provides a single point of control for all enterprise batch jobs. If you are familiar with Control M concepts there are different job positions in different companies like Control-M Admin L3, Control M Developer, Control-M Consultant and many other roles too.
Question 1. What Is Control-m?
Answer :
CONTROL-M is a business integrated scheduling product that focuses on the production environment business applications and platforms. In simple terms "It is a scheduling software like many others (autosys, cron, OPC..etc) using which we can schedule our taskto run them automatically without manual intervention."
Question 2. What Are The Default Port Numbers From Server To Agent And Agent To Server?
Answer :
CONTROL-M/Server and CONTROL-M/Agent communicate by means of two TCP/IPports. They are "Server-to-Agent Port" and "Agent-to-Server Port". The default"Server-to-Agent Port Number" is 7006 and "Agent-to-Server Port Number" is 7005. Normally these values will be in the range of 1025 to 65535 [inclusive].
Question 3. What Are Control M Components?
Answer :
Question 4. Explain Architecture Of Control M?
Answer :
Control-M is a 3 tier architecture. Here you have to explain about the componentsof Control-M (EM, Server and Agents).
Question 5. What Is Datacenter?
Answer :
Question 6. What Are The Control-m Accessories?
Answer :
Answer :
Question 8. What Is Retro Option?
Answer :
If you select this "Retro" option in Scheduling tab, job can be scheduled to run evenafter actual scheduling date has been passed.
Ex: If a job scheduled to run on 20th of every month, but on 20th the Control-MServer is down, and Came up on 21st or later, then while performing the New dayProcess Control-M will check for this option and bring the job into AJF though thejob scheduled date has been crossed.
Answer :
Additional feature control-m has to foresee the job schedule.
You can see this option in 'Scheduling' tab of the job properties dialog box. Whenyou click on this option it will show you next 12 months schedule of the job basedon the options you have specified in this tab.
Using this you can make sure your scheduling criteria is perfect as per the userrequest.
Question 10. What Is Meant By Agent Or Node? Is There Any Difference?
Answer :
Question 11. Difference Between Node And Node Group?
Answer :
Node is a Single Agent whereas Node Group is a collection of agents (more than 1agent).
Question 12. What Is “wait For Confirmation”? What Is The Use Of It?
Answer :
It is similar to a HOLD but the job won't be in Held Status.
Sometimes if any manual confirmation is required before executing a job, we'll use"Wait for confirmation" in Execution tab.
If you select this option, the job will turn in "PINK" color.
You have to Right click and "Confirm" the job to run (it may go in Wait status, if ithas any other prerequisite conditions or time dependency)
Answer :
Maximum number of days that the job can wait to be executed after its original scheduled date has passed.
Question 14. How Many Types Of Conditions You Use In Control-m?
Answer :
2 types.
Prerequisite Conditions and Global Conditions
Question 15. What Are Global Conditions?
Answer :
Question 16. Types Of Conditions In Condition Tab?
Answer :
2 types. In Condition and Out Condition.
Question 17. What Are Resources? And How Many Types Of Resources Are Available In Control-m?
Answer :
Resources will be used to make mutual exclusive jobs (jobs not to run at the sametime).
There are 2 types or resources.
Question 18. Explain Control And Quantitative Resources?
Answer :
Control Resources are the ones which you can specify the type of control the jobsneeds (Exclusive or Shared). They are often used to represent files, or databasetables.
Quantitative Resources are resource definitions for which you specify inCONTROL-M/EM an overall quantity available to the CONTROL-M, and the amountrequired by the job in the Resource tab. Examples of quantitative resources youmight define are CPU (%) , RAM (MB) , Hard Disk (GB) , and Tape Drives (#).
Answer :
It will be used to define variables to pass as parameters to the jobs.
Question 20. What Do You Mean By Auto-edit Variable?
Answer :
AutoEdit variables are resolved at time of job submission, during job execution, orimmediately following job execution (depending on the variable).
These can be used to send as parameters to jobs.
Question 21. What Is Postproc Tab?
Answer :
Question 22. What Is Compstat?
Answer :
It is a Control-M variable which will holds the job Return Code of the current run.
Question 23. What Is Maybe Condition?
Answer :
If you would like to add a In Condition only if the predecessor job exist else ignorecondition, then you have to use May Be Condition.
It is nothing but a Conditional Dependency.
Ex: If JOB-B is depending on JOB-A, but JOB-B have to wait on ONLY when JOB-A isin AJF. In this case we'll give Out Condition of JOB-A as #-JOB-A-OK and inCondition of JOB-B as #-JOB-A-OK
If you add #- before the condition name that will be taken into account only whenthe job is in AJF.
Control M Related Tutorials |
|
---|---|
Shell Scripting Tutorial | Data Warehouse ETL Toolkit Tutorial |
IBM Mainframe Tutorial | Unix/Linux Tutorial |
Job Search Skills Tutorial |
Control M Related Practice Tests |
|
---|---|
Shell Scripting Practice Tests | Job Evaluation Practice Tests |
IBM Mainframe Practice Tests | Autosys Practice Tests |
All rights reserved © 2020 Wisdom IT Services India Pvt. Ltd
Wisdomjobs.com is one of the best job search sites in India.