Chennai Petroleum Corporation Limited JE Previous Paper | 56024

Chennai Petroleum Corporation Limited JE Previous Paper :

Chennai Petroleum Corporation Limited  he wax plant at CPCL has an installed capacity of 30,000 tonnes per annum, which is designed to produce paraffin wax for manufacture of candle wax, waterproof formulations and match wax. A propylene plant with a capacity of 17,000 tonnes per annum was commissioned in 1988 to supply petrochemical feedstock to neighbouring downstream industries.

This unit was set up in Nagapattinam with a capacity of 0.5 MMTPA in 1993 and later enhanced to 1.0 MMTPA.[7] Now this 1.0 MMTPA refinery is being dismantled to increase its capacity to 9.0 MMPTA with cost of 27,000 crores this new project will be completed by 2022 and will boost the company growth further.

From the grassroots stage CPCL Refinery was set up with an installed capacity of 2.5 million tonnes per annum (MMTPA) in a record time of 27 months at a cost of Rs. 430 million without any time or cost overrun.

Here we have provided the information regarding Chennai Petroleum Corporation Limited JE Previous Paper. Check the below details of Chennai Petroleum Corporation Limited JE Previous Paper  before appearing the test.

Click Here for Chennai Petroleum Corporation Limited JE Previous Paper 


Register/Login

New to Wisdom Jobs ? Register Now

Chennai Petroleum Corporation Limited JE Previous Paper Related Searches



All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status