BMRCL Section Engineer Model Question Paper | 55801

BMRCL Section Engineer Model Question Paper:

BMRCL Section Engineer Model Question Paperwas the second rail transport system in India after Kolkata Metro to use 750 V DC third rail traction.In December 2009, the ABB Group was awarded the contract to provide power solutions for the first phase of the planned metro network. ABB designed, supplied, installed and commissioned four substations that receive and distribute electricity.

each rated at 66/33 kV, as well as the auxiliary and traction substations. ABB also provided an integrated network management system, or SCADA (Supervisory Control And Data Acquisition), to monitor and control the installations.[130] The BMRC currently pays BESCOM ₹5.7 per unit of electricity.

In 2016, BMRCL signed an agreement with CleanMax Solar to set up solar installations at Baiyapanahalli and Peenya stations. After Phase 2 of the metro is complete, CleanMax Solar will set up similar installations at the metro depots in Challaghatta, Whitefield, Kothanur and Hebbagodi. Per the agreement, CleanMax Solar will bear the cost of installation and the BMRC will pay CleanMax a rate of ₹5.5 per unit of electricity for three years. Following the three-year period, all six installations will be transferred to the BMRC.

Here we have provided the information regarding Bangalore Metro Rail Corporation Limited BMRCL Section Engineer Model Question Paper. Check the below details of BMRCL Section Engineer Model Question Paper.

Click Here for BMRCL Section Engineer Model Question Paper


Register/Login

New to Wisdom Jobs ? Register Now

BMRCL Section Engineer Model Question Paper Related Searches



All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status