SAP BPC Terminologies - SAP BPC

What is SAP BPC Terminologies?

On comparing BPC 7.5 and BPC 10.0, following are the key terminology differences between the two.

BPC 7.5

BPC 10.0

AppSet

Environment

Dimensions

Dimensions

Applications

Models

Business Rules

Business Rules

Validation Rules

Control Settings

Script Logic

Logic Script

Work Status Settings

Work Status Settings

Journal Templates

Journal Templates

System Report Settings

Audit Report Settings

Environment − it is defined as the starting point for developing any application or version. It was known as application sets or AppSet in older versions of BPC.

Dimensions − you may mark a dimension as secure. You want to provide read and write access to the users who use the model so they can access records.

Properties − this is used to offer additional information to the size.

Dimension Members − each dimension member document shows master, text and hierarchy facts related to the keys of dimension.

Model − to meet the business planning and Consolidation requirement of an company, you need to build a model in an environment that's described as series of several dimensions.

Data Manager Package − To execute common responsibilities in BPC, you need information supervisor package.

Business Rules − To control operations in different countries, specific set of business rules are required. BPC consists of rule-based table to fulfill some requirements for business planning and consolidation. various rules can be set related to business planning and consolidation like - currency translation, balance bring forward, intercompany removal, and information validation, etc.

Logic Scripts − that is defined as a set of square or MDX programming structure to perform some personalize features for flexibility and control information models. when a few specific necessities are not done the use of enterprise rules that may be met through the usage of logic Scripts.

User − A user is described as an individual who makes use of the application in Appset.

Team − A group is described as a group of users based on user roles.

Task − all of the activities which are finished in SAP BPC system are referred to as tasks.

All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status

SAP BPC Topics