Are you looking for an opportunity to build your career in hardware platform? Then just have a look at wisdom jobs to find your prominent career. Hardware is the most important job that is very needy in the computer world. Fieldbus job is the right path to lay a foundation for your career and to show up your talent in this field. Fieldbus is a digital era in a two-way communications system that serves as the base-level network. It is an open architecture developed platform. Access to Fieldbus Jobs interview questions and answers page to explore the levels on the subject. Apply for the Fieldbus jobs based on hardware field. Just log on to our site to get notifications and suitable jobs.
Answer :
The H1 bus speed is not appropriate for machinery control, but it is certainly good for closed loop control in process automation, where control cycle times of 0.25 to 1.0 seconds are commonly used. A very rough estimate says you could get 50 transactions per second. If you leave half of these for unscheduled messages, you could have 4 samples per second for up to 6 control loops, or 1 sample per second for up to 20 loops (which is probably more than you would want to put on a single bus segment).
The exact figure of 31.25kbps was chosen as a binary fraction of a 1MHz crystal oscillator (divide by 32).
Answer :
Logically, Manchester coding produces a square wave. For H1, IEC61158-2 specifies a current signal of about +/- 9mA into a 50-ohm load. But to reduce the bandwidth of the transmitted signal, IEC61158-2 specifies a trapezoidal waveform with rise and fall times between 0.12 and 0.25 of a bit time.
If the device is bus-powered, it simply modulates its DC current draw with this signal. Non-bus-powered devices may take 10mA, simply to provide a base for this modulation. It is allowed for a device to take less than 10mA, then ramp up to 10mA when it wants to transmit. In practice, at this time, all bus-powered devices take more than 10mA.
Question 3. Is The Digital Signal Susceptible To Noise?
Answer :
Yes, but not so much as an analogue signal. The fieldbus pair is balanced about ground, and (using good cable) is twisted, and shielded. All these features reduce the level of induced signals into (or out from) the bus. Unlike analogue signalling, low levels of interference have no effect whatever on the accuracy of digital transmission. Interference test criteria are specified in the IEC61158-2 standard, and suggest undetected error rates of only 1 message in 4 months, even with rather severe interference levels.
Question 4. Can You Reuse The 4-20 Ma Wiring Of An Existing Plant?
Answer :
Yes, certainly. Although existing wiring was not designed to carry high-speed digital information, the H1 signal is robust enough to be carried on typical existing wiring.
However, there are two extra considerations:
Question 5. Do Iec 61158-2 And Isa S50.02 Allow Redundancy In The H1 Bus?
Answer :
Yes. But up until now, manufacturers have chosen not to implement this option.
Question 6. What Kind Of Redundancy Is Possible For Fieldbus System?
Answer :
Question 7. What Are The Various Modes Of Redundancy For Different Topologies Of Fieldbus System?
Answer :
The use of redundancy in a fieldbus system may be influenced by its topology, but much more by the nature of the application. In particular, the user might want to consider redundant power supplies (particularly if one power supply feeds several bus segments). Host system fieldbus I/O channel hardware could be redundant (providing two independent paths to the same bus cable), for increased reliabilty on each segment. Similarly, gateways between segments could be made redundant, if their continued operation is regarded as critical.
In a fieldbus using control in the field, an important function is the LAS (link active scheduler) which controls bus traffic. The host (if there is one) normally provides this LAS function. To survive loss of the host system, it would be worth ensuring that a back-up LAS function is available in one or more of the field devices.
Answer :
Yes, no problem. The separately-powered devices would use explosion-proof or other safety methods, but would also provide a protected IS connection point for the fieldbus.
Answer :
The rules for access to the bus prevent two devices ever transmitting at the same time. Even when two devices have something to say, they must each wait until they are asked for a specific item of data, or receive the token from the LAS to allow an unscheduled message.
Answer :
IEC61158-2 specifies that connecting or disconnecting a device may disturb the bus electrically for not more than 10ms. That means that one message might be corrupted. Each message includes a 16-bit error-check-polynomial code, which virtually guarantees detection of the corruption by the receiver. (Depending on the type and use of the message, the receiver might ask for a repeat, or might simply ignore the message and wait for it next time around. Where the sender needs to know about this, an “acknowledged” message type can be used, and the receiver would simply not acknowledge the lost message.
Question 11. What Will Happen If The Trunk Or A Spur Is Short-circuited?
Answer :
Answer :
Basically, yes! The intention is to take advantage of the commercial development of ethernet, which has produced very low-cost, high-performance hardware. (But watch out for the distance limits on ethernet, unless you use fibre-optic cable.)
TCP/IP will be the basis of the HSE fieldbus, but is not adequate as it stands; enhancements are needed to support the desired predictability of performance.
Answer :
Question 14. What Is The Point Of Removing Several Layers Of The Osi 7-layer System?
Answer :
Question 15. What Are The Different Standards For Different Layers Of Fieldbus?
Answer :
Question 16. What Is The Difference Between The Standards Iec 1158-2, Iec 61158-2 And Isa S50.02?
Answer :
There is no difference! IEC recently renumbered their standards, so 1158 became 61158. The ISA SP50 work has closely paralleled the IEC fieldbus project, and the resulting standards are identical in technical content.
Question 17. How Are Mtbf And Mttr Calculated In A Fieldbus System?
Answer :
For the communication path MTBF, you would need to know which device failures could affect it, and their likelihood. You also have to decide whether continued communication with a host system is necessary, or whether the system can continue to operate without it. Common-point failures such as a non-redundant power supply might be the major item. With redundant power supplies, the chance of physical damage to the bus might be more important.
MTTR should be estimated on the basis of replacement of failed devices, rather than repair. If a spare device is available, this can be done within a few seconds (as far as the bus connection and communication functions are concerned; physical installation is likely to be the limiting factor).
Answer :
Yes, they can. In the IEC and FF protocols, discrete variables are encoded as 8-bit unsigned integers. I assume the value would be either 0 or 1. As for all measurements, an 8-bit status value is always sent with it.
Question 19. Is It Possible To Place A Thermocouple Or Rtd Directly On Fieldbus?
Answer :
No. You would always need transmitter electronics to implement the communication protocol. (However, a head-mounted transmitter may well be possible.)
Answer :
For IEC or FF protocols, the expectation is that a PLC would be connected at the H2 or HSE (high speed ethernet) level, since it would probably be handling a large quantity of data. A fieldbus engineering station may be directly connected to an individual H1 bus segment, or (better) it may be integrated into a host (“DCS”) device, serving many segments. When HSE is used, this same connection could also be used to program the PLC.
However, even if different software and communication paths must be used, with Windows NT or some similar multi-tasking operating system, there is no reason why a single user interface should not provide both functions.
Question 21. Can A Plc Be Interfaced Directly With H1 Bus?
Answer :
It is quite likely that PLCs will use H1 fieldbus as an I/O path to measurement and actuator field devices. I think it is less likely that a PLC would provide an H1 connection to a host, with the PLC itself acting as a field device. HSE (high speed ethernet) would usually be more appropriate at that level.
Question 22. How Can A Fieldbus System Be Implemented In An Existing Hart System?
Answer :
HART and FF have one great feature in common – they both use Device Descriptions (DDs). This makes it possible to mix HART and FF in one system and get equivalent capabilities for device configuration, diagnostics and instrument management.
Hardware for a mixed system needs some care. Either, a host must offer both types of I/O system, or the host can use only FF, with a HART-to-FF gateway to connect to the existing HART devices. But be careful of the speed difference! In some applications, HART communication is not fast enough to use for the control variables, especially if multidrop HART is used. A gateway may, therefore, have to include analogue I/O, with conversion to digital form for the fieldbus connection. In addition, it is not yet clear (at least, to me!) how a HART device should be “disguised” as an FF device by translating its data structures, preferably based on its HART DD. As far as I know, no HART-to-FF gateway yet exists.
Question 23. How Is ‘scan Time’ Defined In A Field Bus System?
Answer :
Communication to and between input and output devices in an FF bus is controlled, millisecond by millisecond, by the LAS (link active scheduler). The sequence of communication activities, which the LAS manages, is set up by the system engineer during design or commissioning. A typical configuration tool will allow you to set up a cycle time for each control loop (whether it resides in the host, or in the field devices, or partly in each), and will automatically arrange the required communication paths and schedules.
Because of the way the LAS works, all cycle times on one bus segment must be fitted into a basic “macrocycle”. Probably, in most cases, this will also be the overall scan cycle time for control loops on that segment.
Question 24. How Is Speed Affected When All Instruments In A Segment Start Talking To Each Other?
Answer :
For scheduled traffic, including any used for control purposes, the timing is pre-configured and always occurs as expected, under the control of the LAS. This is completely unaffected by any unscheduled traffic. In fact, instruments don’t just “start talking”! What happens is that the LAS gives each device a chance to talk, in turn, during the time, in each cycle, allocated for unscheduled messages. (If there isn’t enough time before the next scheduled message, they have to wait until later.)
Question 25. When Are ‘scheduled’ And ‘unscheduled’ Communications Used?
Answer :
Scheduled communications are repeated on a regular pre-configured cycle, and include those messages carrying measurements or outputs used for control purposes.
Unscheduled communications are fitted into idle times in the scheduled message cycle, and are used for almost everything else: operator display updates, tuning parameter and mode changes, process alarms, trend reports, configuration changes, diagnostics, time distribution. (Unscheduled messages can be prioritised; for example, alarms can be dealt with urgently.)
Answer :
Question 27. Who Controls The Traffic (token) On The Bus?
Answer :
The LAS (link active scheduler). In the event of its failure, a back-up LAS (if present) takes over automatically.
Question 28. Where Is The Physical Location Of The Las (link Active Scheduler)?
Answer :
This is a system designer’s (and device manufacturer’s) choice. If there is a host DCS, the LAS will usually be in the fieldbus interface card. If not, it can be in a field device (but only “link master” devices offer this capability).
Question 29. How Can Mcc Status Be Accessed On A Fieldbus System?
Answer :
Any field device functionality you can imagine, can be implemented in a fieldbus device. Access to any particular item or items of data is defined in the Device Description (DD), which a host should use to interrogate the device and interpret the response.
Some common device types have “profiles”, using a standard DD, to reduce the work involved in development, and to achieve a degree of interchangeability. But I don’t believe an MCC profile has yet been published.
Question 30. How Do You Calibrate A Fieldbus Instrument?
Answer :
Answer :
The total message length can vary from 11 to 276 bytes (called “octets” in the fieldbus world), depending on the message type and data content. There are no extra start and stop bits, so at 31.25kbps, each byte takes 256 microseconds. The whole message could therefore take anything from about 3 to 70 milliseconds. Reading a single variable, whether it is discrete or continuous, would be near the shorter end of this range. For efficiency, several variables can often be collected into a single message.
Question 32. Is Fuzzy Logic Control Introduced As A Standard Function Block In Fieldbus?
Answer :
Not as far as I know. But proprietary forms of this function should be available from major manufacturers.
Answer :
The first set of standard FF function blocks include PID with remote setpoint input and feedforward input, Ratio, Bias/Gain (for split range output), and Signal Selector (for override control).
Answer :
It should be possible. Multivariable transmitters are well-supported by the IEC and FF protocols. A fieldbus HTG instrument might connect directly to multiple sensors (pressure, temperature) or might perhaps use a local multidrop HART bus to connect to standard HART transmitters. (These could also be powered from the fieldbus, through an embedded dc-to-dc converter in the HTG device.)
Question 35. How Can Multiple Variables Be Measured Using A Single Fieldbus Instrument?
Answer :
No problem. A device can have as many sensors as the designer wishes. And further derived variables can be calculated from these if desired. Each measured or derived variable is represented by its own Analog Input block, and is thus available to read over the fieldbus. In particular cases, it may be useful to combine several measurements into a single data array for more efficient messages.
Answer :
Answer :
you can put the regulatory control loops in the field if you wish, with advantages of performance and reliability. Complex control functions will stay in the DCS. Supervisory functions, data analysis and links to management systems stay where they are now, but perhaps take extra data directly from field devices by pass-through via the DCS.
The right level to put any function is the lowest at which all the necessary information is available. (For example, it’s probably not useful to put an interactive controller out on a bus segment, if it needs data from devices on another bus segment.)