Testing Challenges and recommendations Agile Testing

In this particular project, the telecommunications vendor was neither the author nor the user of the applications under test; it was simply providing a secure hosted platform to allow others to have access to applications. Access was via secure token authentication and the Citrix Secure Gateway into a Citrix server farm on Windows2003 Server.

the whole platform was subject to a traditional long-term top-down testing project,which had been overtaken by political reality;the platform had gone into a phased live roll-out before the test process had delivered significant results,and issues were emerging in production. Specifically the platform was subject to instability (requiring frequent reboots) and the applications suffered from functional failure under load.

In this context Scapa was asked to test the applications to isolate problems and make recommendations about how they could be made more stable and less prone to failure under load.



Face Book Twitter Google Plus Instagram Youtube Linkedin Myspace Pinterest Soundcloud Wikipedia

All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status

Agile Testing Topics