How To Test A System That Is Never Finished SYNOPSIS Agile Testing

This chapter presents a case study in which a large project was managed with Scrum by splitting the deliverable into three separate parts. Each part was assigned to a separate development team and the project was run as a “Scrum of Scrums.” The case study focuses on one of these teams, describing how they followed the Scrum methodology closely to build and system-test their part of the deliverable. It then examines a few of the reasons for the exceptional outcome achieved by this team:zero code bugs in their first live code release.

The closes with a look at common deviations from the prescribed Scrum methodology, and whether a project that deviates in any of these ways can still be considered to be following Scrum.



Face Book Twitter Google Plus Instagram Youtube Linkedin Myspace Pinterest Soundcloud Wikipedia

All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status

Agile Testing Topics