How To Test A System That Is Never Finished SYNOPSIS Agile Testing

This chapter presents a case study in which a large project was managed with Scrum by splitting the deliverable into three separate parts. Each part was assigned to a separate development team and the project was run as a “Scrum of Scrums.” The case study focuses on one of these teams, describing how they followed the Scrum methodology closely to build and system-test their part of the deliverable. It then examines a few of the reasons for the exceptional outcome achieved by this team:zero code bugs in their first live code release.

The closes with a look at common deviations from the prescribed Scrum methodology, and whether a project that deviates in any of these ways can still be considered to be following Scrum.


All rights reserved © 2018 Wisdom IT Services India Pvt. Ltd DMCA.com Protection Status

Agile Testing Topics